Step 2: Room & Projector Check

Time estimate: 20 minutes

What You'll Do

Measure your room and ceiling, review the three mounting configurations, and decide which one is right for your space. This decision drives the hardware you need and the physical steps in Step 3 -- getting it right here saves rework later.

light fully covers playing surface
Good - light fully covers playing surface
not good - playing surface not fully lit
Not good - playing surface not fully lit

Before You Start

Choosing a Mount Configuration

Three mounting configurations are supported. Each has different height and distance requirements. Review all three and select the one that fits your ceiling height and available space.

Vertical mount
Side mount
End mount
ConfigurationProjector PositionApprox. HeightApprox. Distance
Vertical-MountTable side, pointing straight downSee diagram belowSee diagram below
Side-MountTable side7' -- 8'2' -- 3'6"
End-MountTable head or foot6'5" -- 7'4' -- 6'

The height and distance values are approximations. Shorter distances generally apply to 7' tables; longer distances to 9' tables. Step 3 walks you through finding the exact "sweet spot" for your projector with a hands-on test before you drill anything.

Which Configuration Is Right for Your Room?

Vertical-Mount points the projector straight down from above the edge of the table. It requires minimal horizontal clearance and tends to produce the crispest, brightest image, but it requires a ceiling above the table at the right height. Minimum heights by table size are listed in the diagram below.

Side-Mount is better suited to higher ceilings (7' and above) and tighter rooms. Because the projector is closer to the table, the image is crisper -- particularly on larger tables. Side-Mount is the factory default configuration in ICATS.

End-Mount works well when ceiling height is between 6'5" and 7'. The projector sits at the head or foot of the table and requires 4-6 feet of clearance beyond the end rail. The minimum height of 6'5" keeps the projector above head level for most players.

Vertical Mount projector location diagram showing minimum heights by table size and lens alignment
Vertical-Mount positioning: lens aligned with side pocket, about even with the back edge of a cushion
Side-Mount ideal illumination diagram
Side-Mount ideal illumination
End-Mount ideal illumination diagram
End-Mount ideal illumination

Illumination Requirements for All Configurations

Regardless of which configuration you choose, the projected image must meet these requirements:

  • The bottom edge of the light must cover the bumper corners
  • The top edge of the light must cover the bumper
  • Illumination beyond the table edge is acceptable, though it wastes light

Pre-Built Mount Kits

If your ceiling situation is fairly standard, a ready-made mount kit simplifies the hardware selection. See Mounts section of Compatible Equipment for kits that include mounting hardware and instructions.

If your room has an unusual ceiling type or configuration, see real-world mounting examples. One of those approaches should work for most rooms.

A portable projector stand is also available, which eliminates the need for a permanent mount entirely.

Troubleshooting

Ceiling height is below 6'5"

End-Mount and Side-Mount both require at least 6'5" to keep the projector above head level. If your ceiling is lower, a portable projector stand may be the only viable option. Contact support to discuss your room.

Projector is not on the compatibility list

Not all projectors produce the throw ratio, resolution, and brightness that ICATS requires. Using an incompatible projector is the leading cause of poor image quality and calibration failures. Review projector and room requirements before mounting.

Room dimensions seem tight for all three configurations

Review See mounting examples for examples of non-standard installations. Contact support if none of the configurations appear workable in your space.

What's Next?

With your configuration selected and room confirmed, Step 3 covers the physical mounting process -- finding the exact projector position and attaching it to the ceiling. You will need a ladder, common hand tools, and ideally a second person to help.

Our website uses intelligent chatbots powered by Ultimo Bots to improve customer service.